Northampton’s trusted building company

COMMERCIAL REFURBISHMENT · SWISS BUILD

Drivers’ Room Addition
for CPL Aromas, Brixworth

Swiss Build refurbished an existing space at CPL Aromas in Brixworth to create a dedicated room for visiting lorry drivers, with a toilet and a hatch through to goods-in.

Brixworth, Northamptonshire · Drivers’ facilities · Live factory refurbishment

CLIENT

CPL Aromas

LOCATION

Brixworth, Northamptonshire

PROJECT

Drivers’ room and WC

FINAL ITEM

Door privacy film still to fit

The brief   /   Before & during   /   The work   /   Site challenges   /   The result

THE CLIENT BRIEF

A dedicated space for visiting drivers

CPL Aromas needed a room where lorry drivers could go when they arrived at its Brixworth factory. The refurbishment brought together a waiting space, toilet facilities and a hatch connecting the room to goods-in.

Starting with an unfinished area of the building, we coordinated the plumbing, electrical, flooring and carpentry work. The aim was to make the existing space more practical for drivers and provide a clear point of contact with the goods-in team.

The project was carried out within a live factory, so the work had to be planned around ongoing manufacturing and the site’s restrictions.

PROJECT AT A GLANCE

Existing space. New facilities.

Client
CPL Aromas
Location
Brixworth
Work
Commercial refurbishment
Facilities
Drivers’ room, WC and goods-in hatch
Status
Privacy film to door glazing remains

BEFORE & DURING

From bare blockwork to a fitted room

The early photographs show the existing blockwork, exposed services and unfinished floor. As work progressed, the walls were decorated, the carpentry took shape and the suspended ceiling was installed before the flooring was laid.

Drivers’ room area at CPL Aromas before refurbishment, with bare blockwork and exposed services
The original space before the drivers’ room refurbishment.
Drivers’ room refurbishment in progress, with painted walls and an unfinished suspended ceiling
Work in progress before the remaining ceiling tiles and new flooring were fitted.

WHAT THE WORK INCLUDED

Four trades brought together

The refurbishment combined the building services with the internal finishes, creating a coordinated drivers’ room and WC.

01

Plumbing & wash facilities

Plumbing for the new toilet facilities, including the washbasin and water heater. Press-fit connections suited the site’s restriction on hot works.

02

Electrical work

Electrical work formed part of the fit-out. The room includes ceiling lighting and a wall-mounted heater, with a hand dryer in the wash area.

03

New flooring

Grey flooring runs through the refurbished room and wash area, bringing the spaces together and replacing the unfinished floor shown in the early photographs.

04

Carpentry & internal finishes

Carpentry and door work completed the internal layout around the drivers’ facilities and goods-in hatch. White walls and a suspended ceiling give the room a brighter finish.

Unfinished area with exposed pipework at the start of the CPL Aromas refurbishment
The existing space and services before the fit-out.

WORKING IN A LIVE FACTORY

Site restrictions shaped the work

No hot works. A hot works permit was not available because of flammable products on site. We therefore used press-fit connections for the plumbing, avoiding the need for soldered joints.

Working around the cold mains

The cold mains could not be isolated because manufacturing was continuing. We therefore used pipe freezing as part of the plumbing work, working around this restriction on the supply.

Coordinating work around manufacturing

Alongside these plumbing restrictions, we were working within an operational factory. The sequence of work therefore had to take account of the manufacturing setting as well as the new room’s layout and finishes.

THE REFURBISHED ROOM

Drivers’ facilities beside goods-in

The new room brings the drivers’ waiting space, goods-in hatch and toilet facilities together. The photographs below show the room, wash area and final finishing work.

Final item remaining: the refurbishment is complete apart from privacy film to the glazed door, which is still to be fitted.

Refurbished drivers’ room and goods-in hatch at CPL Aromas in Brixworth
The refurbished drivers’ room, with a hatch through to goods-in.
Refurbished drivers’ room showing the WC entrance, heating and new flooring
The refurbished room and WC entrance. Privacy film is still to be fitted to the door glazing.
New washbasin, water heater and hand dryer in the drivers’ WC at CPL Aromas
The new wash facilities within the drivers’ WC.
Swiss Build team member carrying out finishing work in the CPL Aromas drivers’ room
Carrying out the final finishing work in the new drivers’ room.

MORE SWISS BUILD PROJECTS

Explore our portfolio

See more of our building and refurbishment projects across Northamptonshire.

COMMERCIAL WORK BY SWISS BUILD

Commercial refurbishment in Northamptonshire

Find out about our building and refurbishment services for local businesses and commercial premises.

YOUR NEXT PROJECT

Planning a commercial refurbishment?

Talk to Swiss Build about adapting your premises in Brixworth, Northampton or the surrounding area. Share your plans, photographs and any site restrictions so we can discuss the work you need.